ENERGY INDUSTRY

Construction of the HV/MV Primary Substation named “Ginosa Marina”

Client: E-Distribuzione S.p.A.

  • In progress
  • Cient: E-Distribuzione S.p.A
  • Location: SS 580 – Ginosa (TA)
  • Occupied area: 11.000 mq
  • Collaboration: Boffetti S.p.A.

Project description

The project involves the construction and commissioning of a primary substation designed to meet the requirements for the development and expansion of the electricity network in the Ginosa Marina area. The facility will consist of a high-voltage section using AIS technology and a medium-voltage section comprising two single-busbar containers, suitably configured to ensure operational flexibility.

The cabin will be equipped with protection, control and remote control systems, in line with the latest technical standards, in order to ensure a highly reliable service and efficient management of the infrastructure.

The connection to the grid will be made using a 150 kV dual-antenna configuration to a new RTN substation (or in a temporary configuration), via a feed-in/feed-out connection on the “Ginosa Marina – Matera” line, ensuring adequate levels of redundancy and safety.

11.000 mq

Occupied area

150 kV

Dual-antenna configuration

Realizzazione nuova Cabina Primaria denominata GINOSA MARINA 
(TA)
Scroll to Top