ENERGY INDUSTRY

Construction of the HV/MV Primary Substation named “Oreto”

Client: E-Distribuzione S.p.A.

  • In progress
  • Cient: E-Distribuzione S.p.A
  • Location: City of Palermo (PA)
  • Occupied area: 15.500 mq
  • Collaboration: Boffetti S.p.A.

Project description

The “Oreto” Primary Substation will be connected in a feed-through configuration to the 150-kV “Cappuccini-Ciminna” transmission line. The facility is located on a site with a total area of approximately 15,500 square meters.

The project involves the construction of a new 150/20 kV HV/MV switchgear, featuring a high-voltage (HV) section with an operating voltage of 150 kV and a rated current of 1,250 A. The three-phase short-circuit current on the HV side has a maximum value of 31.5 kA.

The medium-voltage (MV) section will operate at an operating voltage of 20 kV and a rated current of 1,600 A. The system will be designed to provide protection, management, and remote control functions for the power grid.

15.500 mq

Occupied area

31,5 kA

Three-phase short-circuit current on the high-voltage side

Realizzazione nuova Cabina Primaria AT/MT denominata “Oreto”