Construction of a new HV/MV substation named “San Giorgio”

Client: E-distribuzione S.p.A.

  • Client: E-distribuzione S.p.A.
  • Location: C.da Sordo – Foglio 33, P.lle 424, 426 e 428 – Catania (CT)
  • Occupied area: 13,000 sqm
  • Collaboration: Boffetti S.p.A.

Project description

The San Giorgio Main Substation is connected in a feed-through configuration and powered by the 150-kV RTN underground high-voltage line “Misterbianco-Zia Lisa.” This connection links it to Terna’s ‘Misterbianco’ substation and the “Zia Lisa” Main Substation. The substation complies with the “Liberty 1A” standard, with some variations: only one power transformer is installed, there is a second container, and provisions have been made for a possible future connection of a third HV line.

The main technical characteristics of the system are:
– HV operating voltage: 150 kV
– HV current rating: 1250 A
– Three-phase short-circuit current AT: max 31.5 kA
– MV operating voltage: 20 kV
– MV rated current: 1600 A

13.000 mq

Occupied area

150 kV

Primary cabin with AT section

1250 A

Rated current AT

1600 A

Rated current MT