ENERGY INDUSTRY

Construction of a BESS (Battery Energy Storage System) plant

Client: Enel Green Power

  • Client: Enel Green Power
  • Location: Comune of Pavia di Udine (UD)
  • Occupied area: 90,000 sqm
  • Collaboration: Boffetti S.p.A.

Project description

This BESS plant, with a nominal power of 200 MW and a capacity of 800 MWh, has been designed to optimize the use of renewable resources, ensuring a stable and reliable energy supply.

The connection to the grid is via a 220 kV HV cable, derived from the user station inside the plant, ensuring efficient integration with the national electricity system. The infrastructure consists of 216 battery modules, managed by an advanced Battery Management System (BMS) and supported by 54 bidirectional power converters.

The integrated control system ensures efficient and safe operations, flanked by fire protection devices to ensure the highest safety standards.

90.000 mq

Occupied area

800 MWh

System capacity

216

Infrastructure battery modules