Alba Costruzioni, in collaboration with partner companies, is pleased to announce that it has obtained the final award of two significant lots for the construction of new primary substations as part of the tender No. prj_90054 called by Enel Italia S.p.A.
These lots, with an expected contract duration of 1095 consecutive days, represent a major expansion of Alba Costruzioni’s activities in the electrical infrastructure sector.
Alba Costruzioni has been awarded two strategic lots, respectively located in Cinigiano (GR) and San Giorgio (CT), further consolidating its presence in the electrical construction market. In addition to these, the company has been assigned additional optional lots, testifying to the trust placed in Alba Costruzioni for the construction of complex works of national importance.
Optional lots awarded include:
– CP Lot Villa Potenza (MC)
– Lot CP Trasimeno (PG)
– Lotto CP Campofranco (AG)
– Lot CP Jesi Est (AN)
– CP Ceneselli (RO) Lot
– Lotto CP Gualdo Tadino (PG)
– Lot CP Castel Giorgio (TR)
– Lot CP Oreto (PA)
These projects confirm the central role of Alba Costruzioni in the panorama of electrical infrastructure in Italy. Thanks to the experience gained and the constant attention to innovation and sustainability, the company is ready to face these new challenges with the utmost professionalism.
Alba Costruzioni S.c.p.A. thanks its partners and the work team for the commitment and dedication that have made this important result possible.
For more information:
Communication Office Alba Costruzioni S.c.p.A.
info@albacostruzioniscpa.it
Press release of 03/09/2023

