ENERGY INDUSTRY

Construction of a new HV/MV substation named “Cinigiano”

Client: E-distribuzione S.p.A.

  • Client: E-distribuzione S.p.A.
  • Location: Strada Provinciale n°17 Voltina, Km. 16+900, Cinigiano (GR)
  • Occupied area: 9,170 sqm
  • Collaboration: Boffetti S.p.A.

Project description

The Cinigiano Main Substation is connected in a feed-in/feed-out configuration and is powered by the 132-kV RTN “Paganico–Murci” high-voltage overhead line. The facility is located on a plot of land originally used for agricultural purposes, covering approximately 9,170 square meters.

The project involved the installation of a primary substation with a high-voltage (HV) section and two outdoor power transformers, each with a capacity of 25 MVA (132/15 kV). The medium-voltage (MV) section is equipped with 24 kV AIS switchgear in a two-level configuration. The protection, control, and remote monitoring equipment is housed in a dedicated building.

The substation operates at a high-voltage (HV) operating voltage of 132 kV and a medium-voltage (MV) operating voltage of 15 kV, with a rated current of 2,500 A.

9.170 mq

Occupied area

25 MVA (132/15KV) x2

Primary substation with HV section with 2 power transformers

AIS 24 kV

The Medium Voltage (MV) section with 24 kV AIS cells in biplane configuration.